BRIDGE HEADS PARK

AT ROYAL PARK BRIDGE

This design-build streetscape project completed by SCEC included the challenging relocation and installation of 13 mature (20 to 30 years old) Gumbo Limbo trees. The trees were relocated from various sites in South Florida to the Royal Park Bridge in downtown West Palm Beach. Due to the tree sizes and restricted access at the bridge, the trees were required to be transported and set by barge.

Name:

Bridge Heads Park at Royal Park Bridge

Owner:

Florida Department of Transportation

A/E:

Keith and Schnars

Location:

West Palm Beach, Florida

Sunrise: 5391 N. Nob Hill Road, Sunrise, FL  33351 

Coral Gables: 2655 S Le Jeune Road, Suite 323, Coral Gables, FL 33134   

info@statecontracting.com  |   954.923.4747

CGC 1520126

© 2020 State Contracting & Engineering. Proudly created by THYNKgroup, LLC

  • Facebook - Black Circle