top of page

Bridge Heads Park at Royal Park Bridge

This design-build streetscape project completed by SCEC included the challenging relocation and installation of 13 mature (20 to 30 years old) Gumbo Limbo trees. The trees were relocated from various sites in South Florida to the Royal Park Bridge in downtown West Palm Beach. Due to the tree sizes and restricted access at the bridge, the trees were required to be transported and set by barge.

LBTS Downtown.jpg

Bridge Heads Park at Royal Park Bridge

Name:

Florida Department of Transportation

Owner:

Keith and Schnars

A/E:

West Palm Beach, Florida

Location:

BROWARD: 5391 N. Nob Hill Road, Sunrise, FL 33351

MIAMI-DADE: 2655 S. Le Jeune Road, Suite 323, Coral Gables, FL 33134

PALM BEACH: 1615 S. Congress Avenue, Suite 103, Delray Beach, FL 33445

info@statecontracting.com  |  954.923.4747

CGC 1520126

© 2020 State Contracting & Engineering. Proudly created by THYNKgroup, LLC

  • Facebook - Black Circle
bottom of page