top of page

SAWGRASS EXPRESSWAY

TOLL IMPROVEMENTS

This design-build project for the Turnpike consisted of constructing new All Electronic Toll facilities at eight ramp locations along the Sawgrass Expressway. Scope included pavement widening, design and construction of equipment buildings and gantry structures, roadway lighting modification, landscaping, and generator/fuel tank installation. SCEC completed the project two months ahead of schedule.

Name:

Sawgrass Expressway Toll Improvements

Owner:

FDOT/Florida's Turnpike Enterprise

A/E:

ACAI Associates; Keith and Schnars

Location:

Broward County

BROWARD: 5391 N. Nob Hill Road, Sunrise, FL 33351

MIAMI-DADE: 2655 S. Le Jeune Road, Suite 323, Coral Gables, FL 33134

PALM BEACH: 1615 S. Congress Avenue, Suite 103, Delray Beach, FL 33445

info@statecontracting.com  |  954.923.4747

CGC 1520126

© 2020 State Contracting & Engineering. Proudly created by THYNKgroup, LLC

  • Facebook - Black Circle
bottom of page